Channel Avatar

KOOLE Contractors @[email protected]

5.5K subscribers - no pronouns :c

More from this channel (soon)


00:32
Fremantle trailer
03:22
Arrival OS 35 in Port of Amsterdam
00:58
Successful Loading of MV OS35 Wreck!
07:11
Entfernung von 72 jahre alten hafenkränen
01:50
Rückbau des Bergwerkschachtgerüstes „Haus Aden“ in Bergkamen.
15:28
Wreck removal in the Demerara River Georgetown – Guyana
00:43
KOOLE Contractors - Activities preparing the Karaveg
01:30
DecomMissionBlue & Koole Contractors - a circular and sustainable future with a clean North Sea.
02:47
Koole Maritime on Caribbean news: Salvage of 109 shipwrecks after hurricane Irma on Sint Maarten.
01:55
Demolition chemical plant
01:50
KOOLE- Pipeline Decomissioning - North Sea Gas Field
02:14
Batteryspray
04:52
Removing of the fallen crane in Antwerp
01:25
Wreck Removal Plan GOLDEN RAY, Georgia
01:32
Emptying the Chimney UVA, Amsterdam
01:49
Bunker IJmuiden
02:15
KOOLE - Emergency response fire on a paper recycling facility, Dordrecht, Netherlands
01:59
Demolition of external floating roof
01:41
KOOLE Dismantles four ‘ship to shore’ gantry cranes in the Port of Antwerp, Belgium
00:41
KOOLE - Seabed Rake Bucket Prototype
01:12
KOOLE Contractors & Rijkswaterstaat A9 Timelaps
01:50
Demolition of Five oil storage tanks in Antwerp
01:42
Final demolition Harculo
01:45
KOOLE relocated the Atlantic Rotterdam to the IJmondhaven, for the dismantling of the jack-up legs.
01:59
Shorting the legs of the Atlantic Rotterdam
01:59
The demolition of the A9 viaducts Badhoevedorp
01:24
Dismantling of a drydock at Lauwersoog
01:21
Snelle actie na asbestvervuiling op de A4
01:36
KOOLE Contractors dismantled the gas turbine hall in Harculo
02:20
KOOLE Contractors makes preparation prior to the drop of the turbine table
01:40
Building the construction for lowering the boilers
01:47
KOOLE Contractors dismantling gas turbine chimney
01:36
KOOLE Contractors demolishes the last standing structures of HC60.
02:13
KOOLE Contractors demolishes the standing structures of HC50
01:56
KOOLE Contractors lowering the second boiler at Harculo
02:12
KOOLE Contractors prepares the spidercrane for operation
01:53
KOOLE Contractors dismanteling the boiler HC60
01:44
KOOLE Contractors dismantling an air duct and portal.
02:13
KOOLE Contractors cleans the electricity grinds foundations in Nieuw - Vennep
02:43
KOOLE contractors have secured storage space in Amsterdam
01:46
KOOLE CONTRACTORS is currently removing a historical brick Kaaiwall at Antwerp
03:17
KOOLE Contractors is currently dismantling a pvc-plant in Germany
02:23
Dismanteling of chimneys at IJsselcentrale Harculo Zwolle
02:55
600 cars removed from car carrier in Antwerp
01:54
KOOLE Contractors at "Hart van Nederland"
02:03
Demolition of Floating Tank Roofs Eurotank Amsterdam
01:24
Dismantling a 60 meter high chimney in Vlissingen
01:45
Removal of thirteen oil tanks in Rotterdam
01:28
KOOLE Contractors starts decommissioning of Harculo Power Plant
01:28
KOOLE Contractors Removing sludge for construction N31
01:44
Dismantling chemical plant INEOS Geel
01:20
KOOLE Contractors at Offshore Energy 2016
01:55
KOOLE Contractors Spidercrane
01:48
KOOLE Contractors removes burned part of warehouse in De Meern
01:25
KOOLE assists fire department in clearing burned warehouse Hillegom
01:08
Feluy Belgie 2015-12-03
01:31
Evonik Antwerpen
01:04
Sloop ketelstatief FL30 Maxima Centrale Lelystad
01:14
Demolition Video Maxima centrale Lelystad
01:41
GDF SUEZ energie Flevocentrale Maxima centrale